Skip to main content
Whole-House Termite Baiting from RM8995-Year WarrantyFree Quotation on WhatsApp21 Years in Termite ControlSentricon® Baiting SystemShah AlamPJKLKlangPuchongCherasSubangKajangAmpang

Anti-Termite Soil Treatment in Malaysia: How It Works and When to Do It

Written by R Termites Technical TeamPublished

Subterranean termite workers and soldiers (Coptotermes formosanus) close up

Anti-termite soil treatment places termiticide in the ground under and around a building, so subterranean termites coming up from the soil cannot reach it. For a new build it is applied to the open soil before the floor slab is cast. For an existing house it is injected through small drilled holes, which at R Termites starts from RM1950 with a 5-year warranty.

What is anti-termite soil treatment?

A treated zone in the ground that termites cannot cross to reach the building. The termites that damage most Malaysian houses are subterranean: they nest in the soil and travel upwards through cracks in the floor slab, wall joints and the gaps around pipes. Treat the soil they have to pass through, and the house above is protected.

It is done in two ways, depending on whether the building exists yet.

Pre-construction soil treatmentCorrective soil treatment
ForNew builds and extensionsExisting houses and renovations
HowTermiticide applied to open, compacted soilTermiticide injected through small drilled holes
WhenBefore the vapour barrier and slabAny time; easiest during a renovation
Our priceQuoted by floor areaFrom RM1950
Our warrantyConfirmed in the quotation5 years

Source: R Termites Malaysia Services price list, November 2026.

Soil treatment before construction

It has to happen at one specific point in the build. After the ground has been levelled and compacted, and before the vapour barrier and concrete go down, the soil is treated across the floor area. Wall lines, pipe entries and expansion joints get particular attention because those are where termites come through later.

The timing is the whole point. A day after the slab is poured, the same soil is sealed under concrete. That is why we ask owners and contractors to call us before the slab date, not after it. The stages are set out on our anti-termite treatment page.

Much new housing in the Klang Valley stands on former plantation or scrub land where termite colonies were already established, which is why treating at construction stage is so widely done.

Soil treatment for an existing house

The chemical goes in through the floor. Small holes are drilled along the inside and outside of the walls and termiticide is injected into the soil below, building the same kind of treated zone a new house gets before its slab. The full process is in our termite corrective treatment guide.

A renovation is the best time, because floors are open and nothing has to be moved. See the guide to anti-termite treatment during a renovation.

What soil treatment does not do

It blocks the route; it does not hunt down the nest. A soil treatment protects the building it surrounds. The colony itself may still be alive in the ground nearby, in a neighbour's garden or under a tree.

Two practical consequences:

  • Gaps matter. A later extension, a new drain or a dug-up garden bed can break the treated zone. New floor area needs its own treatment.
  • Active termites inside may need baiting. If termites are already feeding in the roof timbers or cabinets, a termite baiting system uses those termites to carry bait back and eliminate the colony.

Many owners use both: soil treatment to close the ground route, bait stations to deal with the colony. The choice is explained in termite baiting vs chemical treatment.

Get a quotation

Building, extending or protecting an existing house in the Klang Valley? WhatsApp us your location and the stage of the build. The quotation is free. Prices for every treatment are in the termite treatment cost guide, and the service itself is described under anti-termite treatment.

Frequently asked questions

What is anti-termite soil treatment?

It is a treated zone of soil under and around a building. Subterranean termites live in the ground, so treating the ground they must cross protects the structure above it.

When should soil treatment be done on a new house?

After the ground is levelled and compacted, and before the vapour barrier and concrete slab go down. Once the slab is cast the soil beneath it can only be reached by drilling.

Can soil treatment be done after the house is built?

Yes. For an existing house the chemical is injected into the ground through small holes drilled along the walls and floor edges. This is called corrective treatment or drill and inject.

How much does anti-termite soil treatment cost?

For an existing house, our chemical injection starts from RM1950 with a 5-year warranty. For a new build the price depends on the floor area, so we quote.

Does a treated house still need inspections?

Yes. Renovations, new extensions, garden work and plumbing repairs can all open a path around treated soil, so it is worth having the house checked, especially before the warranty ends.

Found mud tubes, wings or hollow wood?

Termites keep eating while you wait. WhatsApp us a photo and your area, or call, and we'll send you a quotation.

Get a FREE Quotation

Call or WhatsApp anytime, we'll respond as soon as possible.