Anti-Termite Treatment During a House Renovation: When and How

Written by R Termites Technical TeamPublished

Do the anti-termite treatment while the floor and walls are still open: after hacking and before new tiles, flooring and built-in cabinets. For an existing house we drill along the walls and inject termiticide into the ground, from RM1950 with a 5-year warranty. Any new extension needs its soil treated before its slab is cast.

Why a renovation is the best time for anti-termite treatment

Because the house is open. Treating the ground under an existing house normally means drilling through finished floors and working around furniture. During a renovation the old floor is already hacked up or about to be covered, rooms are empty, and holes can go in before the new finish.

There is a second reason. A renovation brings in exactly what termites eat: new door frames, skirting, wardrobes and kitchen cabinets. Subterranean termites are common in Klang Valley soil, and built-in timber fixed tight against walls is a common place for them to turn up later.

New brick walls and sand at a house renovation in Setapak, Kuala Lumpur, treated with anti-termite chemical injection

Where it fits in the renovation schedule

After hacking, before finishes.

Renovation stageAnti-termite step
Before work startsInspection of the existing house, so old problems are found first
Hacking and demolitionLook at exposed timber and wall bases; tell us if you find mud tubes or live termites
New extension: ground preparedSoil treatment before the vapour barrier and slab
Existing floor: before tilingDrill and inject along walls and floor edges
Cabinets and door frames installedNothing more needed if the ground was treated; bait stations can be added outside for ongoing protection

The joint between the old structure and a new extension deserves particular care, because termites often come up through it.

What the treatment involves

Drill, inject, seal. We drill small holes along the walls and floor edges and inject anti-termite chemical into the ground underneath, so termites coming up from the soil meet treated ground before they reach the new walls, door frames and fittings. The method is set out in our termite corrective treatment guide.

For a new extension the soil is open, so it is treated directly before the slab is cast. See anti-termite soil treatment.

A real renovation job: Setapak, Kuala Lumpur

A house being renovated and extended, with new brick walls going up on the ground floor. We drilled and injected the ground while the floor was open, and the treatment carries a 5-year warranty. The photos are in the Setapak job report.

Price

TreatmentPriceWarranty
Anti-termite chemical injection (drill and inject)From RM19505 years
Soil treatment under a new extensionQuoted by floor areaConfirmed in the quotation
Termite baiting system (Sentricon®), if termites are already activeFrom RM8995 years

Source: R Termites Malaysia Services price list, November 2026.

Against the cost of a renovation, and of replacing termite-damaged cabinets later, it is a small line in the budget. What moves the price is explained in the termite treatment cost guide.

What to tell your contractor

  • Book the anti-termite treatment into the schedule before tiling, not after.
  • Do not cast a new slab until the soil under it is treated.
  • Keep timber offcuts, formwork and cardboard off the bare ground, and clear them before the floor is closed.
  • If anyone finds mud tubes or live termites, leave them and call us.

Planning a renovation?

WhatsApp us your location in the Klang Valley, the renovation plan and the rough dates. We will quote for the anti-termite treatment and coordinate with your contractor. If the existing structure shows signs of termites, send photos of those too, and see what a termite inspection covers.

Frequently asked questions

When during a renovation should anti-termite treatment be done?

After hacking and wet works on the floor are planned, and before the new floor finish and built-in furniture go in. For an extension, before the new slab is cast. Call us when you have the contractor's schedule.

How much does anti-termite treatment cost for a renovation?

Our drill-and-inject chemical treatment starts from RM1950 with a 5-year warranty. Soil treatment under a new extension depends on its floor area. The quotation is free.

My house has never had termites. Is it still worth it?

A renovation is the cheapest moment to do it, because nothing has to be moved or re-tiled afterwards. New timber, cabinets and door frames are also fresh food for termites already living in the soil.

We found termites during hacking. What now?

Stop work on that area, do not spray, and send us a photo. We inspect, deal with the active termites and treat the ground before the area is closed up again.

Do you work with my contractor?

Yes. We coordinate timing and treatment areas directly with your contractor or interior designer.

Found mud tubes, wings or hollow wood?

Termites keep eating while you wait. WhatsApp us a photo and your area, or call, and we'll send you a quotation.

Get a FREE Quotation

Call or WhatsApp anytime, we'll respond as soon as possible.