Do the anti-termite treatment while the floor and walls are still open: after hacking and before new tiles, flooring and built-in cabinets. For an existing house we drill along the walls and inject termiticide into the ground, from RM1950 with a 5-year warranty. Any new extension needs its soil treated before its slab is cast.
Why a renovation is the best time for anti-termite treatment
Because the house is open. Treating the ground under an existing house normally means drilling through finished floors and working around furniture. During a renovation the old floor is already hacked up or about to be covered, rooms are empty, and holes can go in before the new finish.
There is a second reason. A renovation brings in exactly what termites eat: new door frames, skirting, wardrobes and kitchen cabinets. Subterranean termites are common in Klang Valley soil, and built-in timber fixed tight against walls is a common place for them to turn up later.

Where it fits in the renovation schedule
After hacking, before finishes.
| Renovation stage | Anti-termite step |
|---|---|
| Before work starts | Inspection of the existing house, so old problems are found first |
| Hacking and demolition | Look at exposed timber and wall bases; tell us if you find mud tubes or live termites |
| New extension: ground prepared | Soil treatment before the vapour barrier and slab |
| Existing floor: before tiling | Drill and inject along walls and floor edges |
| Cabinets and door frames installed | Nothing more needed if the ground was treated; bait stations can be added outside for ongoing protection |
The joint between the old structure and a new extension deserves particular care, because termites often come up through it.
What the treatment involves
Drill, inject, seal. We drill small holes along the walls and floor edges and inject anti-termite chemical into the ground underneath, so termites coming up from the soil meet treated ground before they reach the new walls, door frames and fittings. The method is set out in our termite corrective treatment guide.
For a new extension the soil is open, so it is treated directly before the slab is cast. See anti-termite soil treatment.
A real renovation job: Setapak, Kuala Lumpur
A house being renovated and extended, with new brick walls going up on the ground floor. We drilled and injected the ground while the floor was open, and the treatment carries a 5-year warranty. The photos are in the Setapak job report.
Price
| Treatment | Price | Warranty |
|---|---|---|
| Anti-termite chemical injection (drill and inject) | From RM1950 | 5 years |
| Soil treatment under a new extension | Quoted by floor area | Confirmed in the quotation |
| Termite baiting system (Sentricon®), if termites are already active | From RM899 | 5 years |
Source: R Termites Malaysia Services price list, November 2026.
Against the cost of a renovation, and of replacing termite-damaged cabinets later, it is a small line in the budget. What moves the price is explained in the termite treatment cost guide.
What to tell your contractor
- Book the anti-termite treatment into the schedule before tiling, not after.
- Do not cast a new slab until the soil under it is treated.
- Keep timber offcuts, formwork and cardboard off the bare ground, and clear them before the floor is closed.
- If anyone finds mud tubes or live termites, leave them and call us.